Tulsa is really two cities to wire. North of 51st you have the oil-boom neighborhoods — Maple Ridge, Swan Lake, Brookside, Cherry Street — most of it built between the 1910s and the 1940s, with plaster walls, original wiring in places, and floor plans that predate the idea of a media room. These homes are beautiful and they are the hardest automation work in the metro. Running cable behind plaster without tearing up a hundred-year-old wall takes patience and a plan, and it is not the same job as a new build.
South of 51st, Tulsa turns into a different city entirely. Much of it was built after Tulsa annexed more than 100 square miles in 1966: subdivisions on slab, big open great rooms, two-story entries, and the same pre-wired problem you find in every Tulsa County suburb — Cat5e and RG6 installed for how people watched TV in 2005, not for how they use a house today.
Integration at Work, AV works across both. Midtown installs get planned around plaster, existing chases, and where an attic drop is actually possible. South Tulsa installs are about undoing an obsolete pre-wire and putting a real network behind it.